Example:
10 units being created
5.5" of material needed per unit
10 ft of material purchase length
Yield calculated with .125 saw blade factored in
I need to see how much of a waste would be left per 10 ft length and again at the full unit purchase (ex. 100 units would purchase 47 10 ft poles) how much is left over? aka waste
Also note lengths vary, so It is not based on any set number...it would all be refered to a different section in the worksheet. Please help!!